A DBFOM P3 to develop the 50 MGD Prospect Lake Clean Water Center in Fort Lauderdale, Florida reached commercial close in February. The concessionaire for the project is a joint venture between IDE Technologies and Ridgewood Infrastructure, with Kiewit as the design-builder for the project. The project includes fixed costs of $485 million and will require $181 million in enabling works.